Home

  Home > PRE-FORMED THERMOPLASTIC MARKINGS > APPLICATION PROCEDURES >

  1. ENSURE SURFACE TO TAKE THERMOLINE IS CLEAN AND DRY - IF NECESSARY DRY DAMPNESS WITH TORCH
  2. USING TORCH, THOROUGHLY HEAT THE AREA TO BE COVERED BY THE MARKING
  3. PLACE MARKINGS IN POSITION WITH PROTECTIVE FILM UPPERMOST, ENSURING ADJOINING PIECES ARE BUTTED UP WELL
  4. REMOVE PROTECTIVE FILM AND HEAT UP MARKINGS USING TORCH
  5. MOVE TORCH IN PENDULUM MOTION BRINGING MARKING TO A FLUID STATE.  APPLY MAXIMUM POSSIBLE HEAT BEFORE MARKING STARTS TO BURN - TAKE CARE NOT TO SCORCH OR DEFORM

** CONCRETE AND EXTREMELY SMOOTH SURFACES SHOULD BE PRIMED WITH TACK COAT PRIMER **


« Back